January 16, 2019 Adventus and Salazar Announce Additional 2018 Drill Results at the Curipamba Project, Including 12.55 Metres of 4.00% Copper, 2.04 g/t Gold, 0.96% Zinc, 25.8 g/t Silver and 0.07% Lead